Tesoro at Grayhawk
Hello Residents!
Week of 1/19/26: This week, our crew will be there to complete painting the Tesoro monuments. This will complete the painting project in Tesoro! Feel free to call our office with any questions.
Week of 1/12/26: This week, our crew will be in Tesoro on Thursday, 1/15/26 to continue and complete any touch ups and outstanding community area items. Feel free to call our office with any questions.
Week of 1/5/26: This week, our crew will be completing touch ups around the community. They will also be painting various walls and gates in the community areas. Feel free to call our office with any questions.
Week of 12/22/25 and 12/29/25: Titan Painting will be closed for the holidays from 12/22/25-1/2/26. Our crew will be back onsite on Monday, 1/5/26. HAPPY HOLIDAYS!
Week of 12/15/25 – This week, we will finish painting the pool iron fencing. We will also be painting front doors, recoating decks and completing touch-ups needed around the community. Feel free to call our office with any questions.
Week of 12/8/25: This week, we will be prepping and painting the Clubhouse and the pool iron fencing. Feel free to call our office with any questions.
Week of 12/1/25: This week, we will be prepping and painting Building 19 (Units #1063, 1064, 1065, 2062, 2064, 2066) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 11/24/25: Unfortunately, we were rained out the week of 11/17/25! So this week, we will be prepping and painting Building 20, (Units 1068, 1069, 1070, 2067, 2069, 2071) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Our crew will be onsite this week from Monday, 11/24-Wednesday, 11/26. We will be closed for Thanksgiving on Thursday, 11/27-Friday, 11/28. Feel free to call our office with any questions.

Week of 11/17/25: This week, we will be prepping and painting Building 20, (Units 1068, 1069, 1070, 2067, 2069, 2071) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 11/10/25: This week, we will be prepping and painting Building 21, (Units 1073, 1074, 1075, 2072, 2074, 2076) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 11/3/25: This week, we will be prepping and painting Building 22, (Units 1078, 1079, 1080, 2077, 2079, 2081) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 10/27/25: This week, we will be prepping and painting Building 23, (Units 1083, 1084, 1085, 2082, 2084, 2086) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 10/20/25: This week, we will be prepping and painting Building 27, (Units 1103, 1104, 1105, 2102, 2104, 2106) (RED). We will also be painting the doors at Building 28 on Monday, 10/20 (Units 1108, 1109, 1110, 2107, 2109, 2111) (BLUE). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 10/13/25: Due to the weather, this week we will be painting the doors and recoating the decks at Building 29 (Units 1113, 1114, 1115, 2112, 2114, 2116) (BLUE). We will also be prepping and painting Building 28, (Units 1108, 1109, 1110, 2107, 2109, 2111) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 10/6/25: This week we will be prepping and painting Building 29, (Units 1113, 1114, 1115, 2112, 2114, 2116) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 9/29/25: This week we will be prepping and painting Building 30, (Units 1118, 1119, 1120, 2117, 2119, 2121) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 9/22/25: This week we will be prepping and painting Building 34, (Units 1138, 1139, 1140, 2137, 2139, 2141) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 9/15/25: This week we will be prepping and painting Building 33, (Units 1133, 1134, 1135, 2132, 2134, 2136) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 9/8/25: This week we will be prepping and painting Building 32, (Units 1128, 1129, 1130, 2127, 2129, 2131) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 9/2/25: This week we will be prepping and painting Building 31, (Units 1123, 1124, 1125, 2122, 2124, 2126) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please note that our office will be closed on Monday, 9/1/25 for the Labor Day holiday. Feel free to call our office with any questions.

Week of 8/25/25: This week we will be prepping and painting Building 26, (Units 1098, 1099, 1100, 2097, 2099, 2101) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 8/18/25: This week we will be prepping and painting Building 25, (Units 1093, 1094, 1095, 2092, 2094, 2096) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 8/11/25: This week we will be prepping and painting Building 24, (Units 1088, 1089, 1090, 2087, 2089, 2091) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 8/4/25: This week we will be prepping and painting Building 40, (Units 1168, 1169, 1170, 2167, 2169, 2171) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 7/28/25: This week we will be prepping and painting Building 39, (Units 1163, 1164, 1165, 2162, 2164, 2166)) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 7/21/25: This week we will be prepping and painting Building 38, (Units 1158, 1159, 1160, 2157, 2159, 2161) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 7/14/25: This week we will be prepping and painting Building 37, (Units 1153, 1154, 1155, 2152, 2154, 2156) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 7/7/25: This week we will be prepping and painting Building 36, (Units 11148, 1149, 1150, 2147, 2149, 2151). (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 6/30/25: This week we will be prepping and painting Building 35, (Units 1143, 1144, 1145, 2142, 2144, 2146). (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 6/23/25: This week we will be prepping and painting Building 1, (Units 1001, 1002, 1003, 2000, 2002, 2004) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 6/16/25: This week we will be prepping and painting Building 2, (Units 1006, 1007, 1008, 2005, 2007, 2009) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 6/9/25: This week we will be prepping and painting Building 3, (Units 1011, 1012, 1013, 2010, 2012, 2014) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 6/2/25: This week we will be prepping and painting Building 4, (Units 1016, 1017, 1018, 2015, 2017, 2019) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All condo patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Feel free to call our office with any questions.

Week of 5/27/25: This week we will be prepping and painting Building 6, (Units 1023, 1024, 1025) and Building 5 (Units 1020, 1021, 1022) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All townhome patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please note that our office will be closed on Monday, 5/27 in observation of Memorial Day. Feel free to call our office with any questions.

Week of 5/19/25: This week we will be prepping and painting Building 8, (Units 1029, 1030, 1031) and Building 7 (Units 1026, 1027,1028) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All townhome patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please feel free to call our office with any questions.

Week of 5/12/25: This week we will be prepping and painting Building 10, (Units 1035, 1036, 1037) and Building 9 (Units 1032, 1033,1034) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All townhome patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please feel free to call our office with any questions.

Week of 5/5/25: This week we will be prepping and painting Building 12, (Units 1041, 1042, 1043) and Building 11 (Units 1038, 1039, 1040) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All townhome patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please feel free to call our office with any questions.

Week of 4/28/25: This week we will be prepping and painting Building 14, (Units 1047, 1048, 1049) and Building 13 (Units 1044, 1045, 1046) (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All townhome patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please feel free to call our office with any questions.

Week of 4/21/25: Due to property closures for repaving, we will not be on-site this week. We will be back to prep and paint Building 14 (Units 1047, 1048, 1049) and Building 13 (Units 1044, 1045, 1046) during the week of 4/28. Feel free to call our office with any questions.
Week of 4/14/25: This week we will be prepping and painting Building 15, Units 1050, 1051, and 1052 (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All townhome patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please feel free to call our office with any questions.

Week of 4/7/25: This week we will be prepping and painting Building 16, Units 1053, 1054, 1055 (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All townhome patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please feel free to call our office with any questions.

Week of 3/31/25: This week we will be prepping and painting Building 17, Units 1056, 1057 and 1058 (RED). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All townhome patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please feel free to call our office with any questions.

Week of 3/24/25: This week we will continue painting the walls in the areas in RED. We will also be prepping and painting Building 18, Units 1059, 1060 and 1061 (BLUE). Please make sure that vegetation, decor, lights and critter fencing are removed from the walls and iron so that we have access to paint. All townhome patio items, including furniture/rugs/grills/wall decorations/TVs/other items attached to the building are moved to the center of the patio and covered, moved inside, or moved to the garage. All upper decks will be recoated so all items must be removed and the deck should remain clear for at least 48 hours. Please feel free to call our office with any questions.


Week of 3/17/25: This week we will be painting the walls in the areas in RED. Please feel free to call our office with any questions.

Week of 3/10/25: This week we will be painting the walls in the areas in RED. Please feel free to call our office with any questions.

Week of 3/3/25: This week we will be prepping the walls in the areas in RED. Please feel free to call our office with any questions.

Week of 2/24/25: This week we will be prepping the walls in the areas in RED. Please feel free to call our office with any questions.